- Home
- Mining & Staking
- CleanSpark Posts 987.1 Million USD Loss as Bitcoin Miners Brace for Difficulty Jump
CleanSpark Posts 987.1 Million USD Loss as Bitcoin Miners Brace for Difficulty Jump

CleanSpark reported a 987.1 million USD annual net loss on November 24, 2026, exposing how fast shrinking mining margins are squeezing even top-tier operators as Bitcoin trades near 60,717 USD ahead of a projected difficulty spike on November 27.
By Michael Nguyen | November 26, 2026
For everyday crypto investors, the report from CleanSpark (NASDAQ: CLSK) carries a clear portfolio warning. Mining stocks no longer move simply like leveraged bets on Bitcoin's price. When electricity costs stay fixed and coin rewards tighten, big public miners have to spend billions to convert their power sites into artificial intelligence data centers—or risk burning cash while waiting for a market rebound.
Table of Contents
The Hardware/Software Landscape
CleanSpark spent fiscal year 2026—which ended September 30, 2026—upgrading its machines even as it began moving prime real estate out of crypto mining. According to financial disclosures covered by MLQ.ai and CryptoBriefing, the company improved its year-end fleet efficiency from 16.7 J/TH to 14.8 J/TH. In plain English, J/TH (joules per terahash) works like a car's miles-per-gallon rating: the lower the number, the less electricity a mining computer burns to solve the same math puzzle.
Across the wider industry, older machines are getting priced out of the market. TradingView and CoinMarketCap market analyses show that standard fleets running around 20 J/TH at an electricity rate of 0.05 USD per kilowatt-hour are already operating on razor-thin margins, while older rigs above roughly 25 J/TH risk falling below breakeven and getting unplugged.
Meanwhile, CleanSpark's hardware footprint is splitting in two directions—modernizing remaining mining rigs while preparing high-density liquid-cooled halls for artificial intelligence tenants. The centerpiece of that shift is its campus in Sandersville, Georgia, where the company signed a 20-year triple-net lease—a contract where the tenant pays property taxes, insurance, and maintenance—covering 175 megawatts (MW) of critical IT power load for AI and high-performance computing.
Hashrate & Difficulty
Even with newer machines, CleanSpark produced fewer coins over the past year. CoinMarketCap and CryptoBriefing figures from the fiscal 2026 report show annual output dropped 8 percent to 7,253 BTC, while the company's average hashrate—how many workers are competing to verify transactions and earn new coins—fell 21 percent to 36.0 EH/s (exahashes per second).
The broader Bitcoin network has been just as bumpy. After soaring electricity prices in West Texas forced some operators to temporarily power down rigs, Bitcoin mining difficulty—the automatic dial that makes puzzles harder or easier so new blocks arrive roughly every ten minutes—dropped 9.13 percent on November 14, 2026, falling from 148.36 trillion to 134.82 trillion, according to NewHedge and KuCoin data. That cut gave surviving miners a brief breather.
That relief ends quickly. As global hashrate bounced back between 1.0 and 1.1 zettahashes per second (ZH/s), trackers including TradingView and CryptoRank project Bitcoin difficulty will jump by roughly 8.5 percent to 9 percent on November 27, 2026, pushing back toward the 146 trillion to 147 trillion range. Under otherwise steady conditions, a roughly 9 percent difficulty hike cuts expected daily Bitcoin earnings per machine by about 8.3 percent.
- CleanSpark annual output — 7,253 BTC mined in fiscal 2026, down 8 percent year-over-year.
- Network difficulty rebound — Projected to rise 8.5 percent to 9 percent on November 27, 2026, toward 146 trillion to 147 trillion.
- Global hashrate — Fluctuating around 1.0 to 1.1 ZH/s after recovering from mid-month Texas power curtailments.
Profitability Metrics
The profit squeeze shows up clearly on CleanSpark's income statement. Full-year revenue fell 25 percent year-over-year to 576.5 million USD, while the company swung from a 364.5 million USD net profit in fiscal 2025 to a 987.1 million USD net loss—or 3.74 USD per basic share—in fiscal 2026, according to CoinMarketCap and MLQ.ai.
Fourth-quarter revenue dropped 46 percent to 120.9 million USD, though quarterly accounting gains helped CleanSpark post a modest 9.8 million USD net profit for that final three-month stretch. Much of the full-year red ink came from non-cash accounting marks rather than cash flying out the door today: SpazioCrypto and Crypto.news report 281.6 million USD in Bitcoin fair-value losses alongside depreciation and asset impairments tied to converting mining facilities.
Still, daily mining pay remains tight across the whole sector. Hashprice—the industry's benchmark for daily revenue per unit of computing power—has hovered around 26 USD to 28 USD per petahash per day, according to Holder.io, CryptoRank, and TradingView. With Bitcoin sitting at 60,717 USD and market sentiment stuck at 11 (Extreme Fear on the Crypto Fear & Greed Index, down from 13 yesterday), CleanSpark's balance sheet cushion matters more than ever: the company closed fiscal 2026 with roughly 1.3 billion USD in total liquidity, including 13,530 BTC held in reserve.
Environmental Impact
Power access and grid politics now decide which miners survive and which get locked out. Nasdaq and Investing.com disclosures show CleanSpark ended fiscal 2026 with 1.8 gigawatts (GW) of contracted power capacity—using 808 MW concurrently for active Bitcoin mining—within a broader development pipeline exceeding 2 GW, including large footprints in Texas such as roughly 285 MW in Austin and Sealy County and up to 600 MW across phases in Brazoria County.
CleanSpark reports that more than 90 percent of its electricity comes from clean or carbon-free sources, leaning heavily on nuclear baseload generation and solar programs in Georgia while using immersion cooling and demand-response programs that dial power down when local grids get strained. That flexibility stands in sharp contrast to tighter rules abroad: on November 9, 2026, Norway's grid operator Statnett froze new large data center grid connections through August 1, 2027, after connection requests hit 34 GW against Norway's 25 GW national peak demand, pairing the pause with a licensing plan that shuts out new crypto mining projects in favor of essential infrastructure, Rystad Energy and ExplainX report.
Strategic Outlook
For investors, CleanSpark's bet is simple: turn volatile mining power into steady rent checks. The 20-year Sandersville agreement represents roughly 6.6 billion USD in contracted lease revenue—or 6.56 billion USD, potentially scaling to 11.6 billion USD if extension options are exercised—with the first AI data hall delivery and lease payments targeted for November 2027, according to CleanSpark and BigGo. To pay for that buildout without dumping its Bitcoin stash at low prices, CleanSpark lined up 2.276 billion USD in project-level senior secured notes.
CEO and Chairman Matt Schultz framed the transition as a turning point for the business. "Fiscal 2026 was a defining year for CleanSpark as we made significant progress in executing our strategic transformation," Schultz said in the earnings release. "We have proven our ability during this year to translate our strengths into long-term contracted opportunities, while securing the necessary capital to execute."
In the near term, regular investors should watch how mining companies manage the gap between today's low hashprice and tomorrow's AI paychecks. Pure-play mining revenue is set to face another test as soon as November 27's difficulty adjustment kicks in, leaving operators with heavy debt or older rigs far more exposed than firms backed by long-term power contracts and deep liquidity.
Michael Nguyen's take
I read CleanSpark's 987.1 million USD loss alongside its 14.8 J/TH fleet upgrade as proof that efficient hardware alone no longer shields Bitcoin miners. November 2027 is the milestone on my calendar, when the first Sandersville data hall is scheduled to start generating rent under its 6.6 billion USD lease. Should construction slip while Bitcoin hovers near 60,717 USD after tomorrow's difficulty jump, dipping into that 13,530 BTC reserve could become hard to avoid.
The cryptocurrency market remains highly volatile. This article is for informational purposes only and does not constitute financial advice.
2 Comments